The total project spans across a total area of 15,000 m2.

4th Interchange Sheikh Zayed Road

Dubai, United Arab Emirates

CLient: Dubai Municipality

Award date: July 2002

Completion: November 2003

Service: Roads, Bridges, Infrastructure and MEP Works

BCG was involved in the elaborate construction of an interchange at the junction between Sheikh Zayed Road and Burj Al Arab. The total project spans across a total area of 15,000 m2, delicately changing the systematic nature of the interchange across four loops and two directional ramps with four bridges, four right turn ramps, and two dedicated access ramps to Al-Barsha district.

The project was constructed without disrupting the flow of traffic on Sheikh. Zayed Road by using temporary steel structures as an elevated construction platform.